Wechat: 13989303035
According to the differences in the sheet metal structure of charging station, the process design process varies, but the total does not exceed the following points...
The Chamber of Commerce Building covers an area of 27000 square meters, with a building area of 114000 square meters. The main building has 28 floors (27 above ground), a height of 99.3 meters...
Generally, electric vehicle charging stations are divided into two types: AC and DC. AC charging stations are also divided into single-phase and three-phase...
According to the latest data released by the Austrian Statistical Office, the Austrian fuel vehicle sales market declined in the first half of 2019, but new energy vehicles were rapid...
The Spanish government has accelerated Spain’s progress in the new energy industry through the subsidies for electric vehicle consumption and the subsidy policy for photovoltaic feed-in tariffs...
With the Malta government’s vigorous promotion of electric vehicles and the various subsidies provided, Malta’s new energy-efficient vehicle market is also gradually expanding. At the same time, the demand for charging infrastructure has grown accordingly. FUERD cooperates with a local agent with rich distribution channels to promote the FUERD charging pile brand in the local market
FUERD has long been established in Norway and actively participates in the competition. Many old Nordic rivals such as ABB, Schneider, Siemens, etc., and many local ambitious new energy technology companies. The ongoing and steady promotion strategy is a little slow in time, reflecting a continuous self-development orientation.
FUERD hands with Hong Kong Disneyland to protect your childhood world. Last year, although the growth rate of the global new energy passenger vehicle market slowed down significantly, it still surpassed the peak of 6 million.
Ready to get started?
Send us your requirement and we’ll reply within 24 hours.